Learn about the information and calculations used to determine the appropriate On-Site Sewage Facility (OSSF) type, size, and capacity for a property.
On this Page
Background
OSSF system type calculations help determine an appropriate sewage treatment and disposal system for a property. The calculations consider factors such as soil characteristics, site conditions, expected water usage, available space, and applicable regulations.
These factors can affect the type of system that can be used, its required capacity, and the amount of property needed for treatment and disposal.
For specific requirements, review Travis County Code Chapter 448 and Texas Administrative Code Title 30, Chapter 285.
Essential Information for OSSF System Type Calculations
When performing OSSF system type calculations, consider the following information:
- Soil Characteristics: Understanding the characteristics of the soil helps determine system requirements and which types of systems may be appropriate for the property.
- Site Conditions: Assess site conditions that may affect the appropriate system type, including:
- Slope
- Available space
- Groundwater level
- Proximity to water bodies
- Setbacks from wells, property lines, and buildings
- Water Usage: Determine anticipated water usage to help estimate the required size and capacity of the OSSF. Consider factors such as:
- Number of occupants
- Water-consuming fixtures
- Peak usage periods
Review Table III, Chapter 285.91 for minimum water usage rates for various uses.
- Regulatory Requirements: OSSF requirements may vary based on the property, system, and applicable regulations. Requirements may address setbacks, system types, sizing, maintenance, and other aspects of the system.
For specific requirements, review Travis County Code Chapter 448 and Texas Administrative Code Title 30, Chapter 285.
- Disposal and Treatment Type: The proposed treatment and disposal method can affect the minimum amount of area required on the property.
Note: Residential requirements are generally based on flow rate, minimum required area, and credit area.
OSSF Design Considerations
When planning an OSSF, consider the system type, required capacity, ongoing maintenance, and potential future needs of the property.
Evaluate the available system types, such as:
- Septic tanks
- Aerobic treatment units
- Mound systems
- Alternative technologies
The selected system should be appropriate for the site's conditions and meet applicable regulatory requirements. Consider installation requirements, maintenance needs, long-term costs, and the advantages and limitations of each system type.
Codes and Resources
Review the following Travis County and state requirements for additional information about OSSF system types, calculations, and design.
Travis County Requirements
- Travis County Code Chapter 448
- State Requirements
- Texas Administrative Code Title 30, Chapter 285
- Table III, Chapter 285.91
Can’t find what you’re looking for?
If you can’t find information about a specific permit or need help, fill out the Contact & Feedback Form. We will get back to you shortly.
You can also request a pre-application meeting to discuss any questions about your project by submitting a Request a Pre-Development Meeting.
For other ways to reach us, visit our Contact page.